ITAC Assessment: AS0084
ITAC logo
ITAC Assessment: AS0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product ULTRASONIC MED. EQUIP.
NAICS
n/a
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 277
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,528 3,776,671
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3191: Use demand controller or load shedder $5,468 $3,050 $5,468
-
kWh
02 2.4133: Use most efficient type of electric motors $122 $238 $122
1,758
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $331 $1,500 $331
4,982
kWh
04 2.6121: Reduce hot water temperature to the minimum required $1,723 - $1,723
26,084
kWh
05 2.2511: Insulate bare equipment $240 $83 $240
3,517
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,618 $1,900 $3,618
54,807
kWh
07 2.7135: Install occupancy sensors $1,285 $900 $1,285
19,343
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $346 $600 $346
5,275
kWh
TOTAL RECOMMENDED $13,133 $8,271 $13,133
115,766
kWh
TOTAL IMPLEMENTED $2,085 $321 $2,085
31,359
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs