Assessment Year | 1993 |
---|---|
Principal Product | FLOUR/CORN TORTILLA,CHIP |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
n/a
|
Annual Production | 6,000,000
lb
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $160,620 | 1,977,726 |
kWh
|
$0.081 |
Natural Gas | $112,529 | 25,066 |
MMBtu
|
$4.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $104,951 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,040 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $100,911 | $482,500 |
$150,173
-
kWh
|
$(-59,148.0)
-
MMBtu
|
$9,886 | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $270 | $400 | - |
$270
-
MMBtu
|
- | |
03 | 2.2135: Repair and eliminate steam leaks | $186 | $240 | - |
$186
-
MMBtu
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $213 | $300 | - |
$213
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $469 | $703 |
$469
5,862
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $267 | - |
$267
3,224
kWh
|
- | - | |
07 | 2.7144: Install spectral reflectors / delamp | $1,635 | $4,543 |
$1,635
20,223
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $510 | - |
$545
6,741
kWh
|
- | $(-35.0) | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $490 | $500 |
$490
6,155
kWh
|
- | - | |
TOTAL RECOMMENDED | $104,951 | $489,186 |
$153,579
42,205
kWh
|
$(-58,479.0)
-
MMBtu
|
$9,851 | ||
TOTAL IMPLEMENTED | $4,040 | $6,686 |
$3,406
42,205
kWh
|
$669
-
MMBtu
|
$(-35.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs