ITAC Assessment: AS0082
ITAC logo
ITAC Assessment: AS0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product FLOUR/CORN TORTILLA,CHIP
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 5,200
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,620 1,977,726
kWh
Natural Gas $112,529 25,066
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $100,911 $482,500 $150,173
-
kWh
$(-59,148.0)
-
MMBtu
$9,886
02 2.1233: Analyze flue gas for proper air/fuel ratio $270 $400 - $270
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $186 $240 - $186
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $213 $300 - $213
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $469 $703 $469
5,862
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $267 - $267
3,224
kWh
- -
07 2.7144: Install spectral reflectors / delamp $1,635 $4,543 $1,635
20,223
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $510 - $545
6,741
kWh
- $(-35.0)
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $490 $500 $490
6,155
kWh
- -
TOTAL RECOMMENDED $104,951 $489,186 $153,579
42,205
kWh
$(-58,479.0)
-
MMBtu
$9,851
TOTAL IMPLEMENTED $4,040 $6,686 $3,406
42,205
kWh
$669
-
MMBtu
$(-35.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs