ITAC Assessment: AM0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel and aluminum forgings
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 8,000
ft2
Annual Production 8,800,000
lb
Production Hrs. Annual 2,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,952 757,913
kWh
Electricity Demand $13,853 4,589
kW-mo/yr
Electricity Fees $537 -
Natural Gas $565,083 142,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,145 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $30,640 $1,200 - - - $30,640
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $24,560 $5,000 - - - $24,560
-
MMBtu
-
03 3.4155: Meter waste water $17,000 $4,800 - - - - $17,000
-
Tgal
04 2.3212: Optimize plant power factor $3,700 $8,650 - $3,700
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $2,780 $2,790 - - - $2,780
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $15 $1,790
33,118
kWh
- - - -
07 2.2136: Install / repair insulation on steam lines $1,710 $1,250 - - - $1,710
-
MMBtu
-
08 3.4154: Eliminate leaks in water lines and valves $1,190 $350 - - - - $1,190
-
Tgal
09 2.7111: Reduce illumination to minimum necessary levels $465 $30 $370
7,034
kWh
$95
-
kW-mo/yr
- - -
10 2.8123: Pay utility bills on time $310 - - - $310 - -
TOTAL RECOMMENDED $84,145 $24,085 $2,160
40,152
kWh
$3,795
-
kW-mo/yr
$310 $59,690
-
MMBtu
$18,190
-
Tgal
TOTAL IMPLEMENTED $84,145 $24,085 $2,160
40,152
kWh
$3,795
-
kW-mo/yr
$310 $59,690
-
MMBtu
$18,190
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs