Assessment Year | 1993 |
---|---|
Principal Product | SEMICONDUCTOR EQUIPMENT |
NAICS |
n/a
|
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
n/a
|
Annual Production | 50
pieces
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $323,999 | 4,843,787 |
kWh
|
$0.067 |
Natural Gas | $2,020 | 283 |
MMBtu
|
$7.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,013 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,879 | $54,452 |
$23,879
356,975
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,735 | - |
$4,094
61,254
kWh
|
$(-359.0) | |
03 | 2.7135: Install occupancy sensors | $392 | $900 |
$392
5,862
kWh
|
- | |
04 | 2.7234: Use heat pump for space conditioning | $74,458 | $335,000 |
$74,458
1,113,423
kWh
|
- | |
05 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,329 | $14,000 |
$5,329
79,719
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,734 | $1,000 |
$3,734
55,979
kWh
|
- | |
07 | 2.4314: Use synthetic lubricant | $204 | $1,080 |
$204
2,931
kWh
|
- | |
08 | 2.7134: Use photocell controls | $176 | $80 |
$176
2,638
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $106 | $180 |
$106
1,465
kWh
|
- | |
TOTAL RECOMMENDED | $112,013 | $406,692 |
$112,372
1,680,246
kWh
|
$(-359.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs