ITAC Assessment: AS0079
ITAC logo
ITAC Assessment: AS0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product SHEET METAL PRODUCTS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $500
k
to 1
M
# of Employees 15
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 2,211
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,294 97,890
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,222 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4239: Eliminate or reduce compressed air usage $629 $1,000 $629
4,982
kWh
02 2.4314: Use synthetic lubricant $228 - $228
1,758
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $926 $400 $926
7,327
kWh
04 2.4133: Use most efficient type of electric motors $157 $208 $157
1,172
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $359 - $359
2,931
kWh
06 2.7234: Use heat pump for space conditioning $357 $1,420 $357
2,931
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,526 $5,661 $1,526
12,309
kWh
08 2.8114: Change rate schedules or other changes in utility service $1,040 $3,550 $1,040
-
kWh
TOTAL RECOMMENDED $5,222 $12,239 $5,222
33,410
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs