Assessment Year | 1993 |
---|---|
Principal Product | MACHINERY, ANODIZING |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 1,200
pieces
|
Production Hrs. Annual | 5,928
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $255,492 | 2,492,673 |
kWh
|
$0.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $229,643 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,430 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $167,933 | $370,044 |
$192,231
1,393,025
kWh
|
$(-45,194.0)
-
MMBtu
|
$20,896 | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $54,544 | $70,044 |
$88,927
867,526
kWh
|
$(-34,383.0)
-
MMBtu
|
- | |
03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $403 | $1,200 |
$403
3,810
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,061 | $10,100 |
$5,061
49,531
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,119 | - |
$1,191
9,672
kWh
|
- | $(-72.0) | |
06 | 2.4314: Use synthetic lubricant | $364 | - |
$364
3,517
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $219 | $450 |
$219
2,052
kWh
|
- | - | |
TOTAL RECOMMENDED | $229,643 | $451,838 |
$288,396
2,329,133
kWh
|
$(-79,577.0)
-
MMBtu
|
$20,824 | ||
TOTAL IMPLEMENTED | $56,430 | $71,244 |
$90,885
884,525
kWh
|
$(-34,383.0)
-
MMBtu
|
$(-72.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs