ITAC Assessment: AS0078
ITAC logo
ITAC Assessment: AS0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product MACHINERY, ANODIZING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 1,200
pieces
Production Hrs. Annual 5,928
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $255,492 2,492,673
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $229,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $167,933 $370,044 $192,231
1,393,025
kWh
$(-45,194.0)
-
MMBtu
$20,896
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $54,544 $70,044 $88,927
867,526
kWh
$(-34,383.0)
-
MMBtu
-
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $403 $1,200 $403
3,810
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,061 $10,100 $5,061
49,531
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,119 - $1,191
9,672
kWh
- $(-72.0)
06 2.4314: Use synthetic lubricant $364 - $364
3,517
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $219 $450 $219
2,052
kWh
- -
TOTAL RECOMMENDED $229,643 $451,838 $288,396
2,329,133
kWh
$(-79,577.0)
-
MMBtu
$20,824
TOTAL IMPLEMENTED $56,430 $71,244 $90,885
884,525
kWh
$(-34,383.0)
-
MMBtu
$(-72.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs