ITAC Assessment: AS0074
ITAC logo
ITAC Assessment: AS0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FABRICATED STRUCTURAL STEEL
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $5
M
to 10
M
# of Employees 81
Plant Area
n/a
Annual Production 6,000,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,348 1,221,278
kWh
Natural Gas $15,732 3,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $9,393 $160,800 $9,393
128,370
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,790 $568 $1,983
27,843
kWh
$(-193.0)
03 2.6218: Turn off equipment when not in use $515 $630 $515
7,034
kWh
-
04 2.4133: Use most efficient type of electric motors $321 $3,168 $321
4,396
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,552 $160 $1,552
21,102
kWh
-
TOTAL RECOMMENDED $13,571 $165,326 $13,764
188,745
kWh
$(-193.0)
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs