| Assessment Year | 1992 |
|---|---|
| Principal Product | ALUMINUM TUBING |
| NAICS |
n/a
|
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
n/a
|
| Annual Production | 24,000,000
lb
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $819,641 | 11,536,929 |
kWh
|
$0.071 |
| Natural Gas | $1,134,665 | 254,015 |
MMBtu
|
$4.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $57,228 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,838 | $28,119 |
$2,838
39,859
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $762 | - |
$762
10,844
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,183 | $4,100 |
$1,183
16,706
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,487 | $1,000 |
$3,487
49,238
kWh
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,744 | $2,500 |
$12,744
179,367
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $15,532 | $1,099 |
$15,532
218,640
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,761 | $5,217 |
$1,916
26,964
kWh
|
$(-155.0) | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,921 | $21,494 |
$18,921
266,413
kWh
|
- | |
| TOTAL RECOMMENDED | $57,228 | $63,529 |
$57,383
808,031
kWh
|
$(-155.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs