ITAC Assessment: AS0069
ITAC logo
ITAC Assessment: AS0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STRUCTURAL BLOCK
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 8,112
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $597,226 10,858,734
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $324,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $258,322 $1,645,200 $580,044
10,565,358
kWh
$(-163,242.0)
-
MMBtu
$(-158,480.0)
02 2.2414: Use waste heat from hot flue gases to preheat $18,021 $28,500 - $18,021
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,765 $30,882 $13,765
250,293
kWh
- -
04 2.4133: Use most efficient type of electric motors $2,187 $9,540 $2,187
39,859
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,178 - $1,178
21,395
kWh
- -
06 2.7233: Use properly designed and sized hvac equipment $10,010 $349,500 $10,010
182,005
kWh
- -
07 2.7422: Plant trees or shrubs near windows to shield from sunlight $2,715 $4,900 $2,715
49,238
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $11,565 $17,450 $13,110
238,277
kWh
- $(-1,545.0)
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,137 $400 $5,137
93,494
kWh
- -
10 2.4312: Improve lubrication practices $1,744 $4,914 $1,744
31,653
kWh
- -
TOTAL RECOMMENDED $324,644 $2,091,286 $629,890
11,471,572
kWh
$(-145,221.0)
-
MMBtu
$(-160,025.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs