ITAC Assessment: AS0067
ITAC logo
ITAC Assessment: AS0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PHARMACEUTICAL DRUGS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 5,304
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $822,354 13,906,800
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $303,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $303,419

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $793 $6,684 $793
13,482
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,648 $6,290 $2,648
44,842
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $22,425 $82,095 $22,425
379,250
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $352 $1,008 $352
5,862
kWh
- -
05 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $264,625 $2,031,000 $624,765
10,772,568
kWh
$(-198,551.0)
-
MMBtu
$(-161,589.0)
06 2.2511: Insulate bare equipment $264 $280 - $264
-
MMBtu
-
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,838 $7,000 - $2,838
-
MMBtu
-
08 2.2414: Use waste heat from hot flue gases to preheat $6,956 $19,000 - $6,956
-
MMBtu
-
09 2.1242: Minimize boiler blowdown with better feedwater treatment $2,518 $5,000 - $2,518
-
MMBtu
-
TOTAL RECOMMENDED $303,419 $2,158,357 $650,983
11,216,004
kWh
$(-185,975.0)
-
MMBtu
$(-161,589.0)
TOTAL IMPLEMENTED $303,419 $2,158,357 $650,983
11,216,004
kWh
$(-185,975.0)
-
MMBtu
$(-161,589.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs