ITAC Assessment: AS0066
ITAC logo
ITAC Assessment: AS0066
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product HEAT TREATING
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area
n/a
Annual Production 132,600
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $375,222 4,701,934
kWh
Natural Gas $85,075 18,058
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $222,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $222,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,219 $4,230 $1,219
15,240
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,749 - $1,749
21,981
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,062 $4,836 $1,062
13,189
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,140 $7,221 $3,259
40,739
kWh
- $(-119.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,921 $7,200 $4,921
61,547
kWh
- -
06 2.7111: Reduce illumination to minimum necessary levels $1,845 - $1,845
23,154
kWh
- -
07 2.7422: Plant trees or shrubs near windows to shield from sunlight $384 $800 $384
4,689
kWh
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $739 $500 $739
9,379
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,623 $200 $1,623
20,223
kWh
- -
10 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $206,000 $800,000 $375,222
4,701,934
kWh
$(-98,693.0)
-
MMBtu
$(-70,529.0)
TOTAL RECOMMENDED $222,682 $824,987 $392,023
4,912,075
kWh
$(-98,693.0)
-
MMBtu
$(-70,648.0)
TOTAL IMPLEMENTED $222,682 $824,987 $392,023
4,912,075
kWh
$(-98,693.0)
-
MMBtu
$(-70,648.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs