| Assessment Year | 1992 |
|---|---|
| Principal Product | POTATO CHIPS |
| NAICS |
n/a
|
| SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
| Sales Range | $5 M to 10M |
| # of Employees | 36 |
| Plant Area |
n/a
|
| Annual Production | 210,000
pieces
|
| Production Hrs. Annual | 5,616
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $19,402 | 197,538 |
kWh
|
$0.098 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,371 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,371 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $2,190 | $800 |
$2,190
22,274
kWh
|
- | - | |
| 02 | 2.7233: Use properly designed and sized hvac equipment | $1,689 | $8,870 |
$1,689
17,292
kWh
|
- | - | |
| 03 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $222 | $320 |
$222
2,345
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $469 | $1,293 |
$495
4,982
kWh
|
- | $(-26.0) | |
| 05 | 2.4133: Use most efficient type of electric motors | $100 | $606 |
$100
1,172
kWh
|
- | - | |
| 06 | 2.2425: Use flue gases to heat process or service water | $4,458 | $25,000 | - |
$4,458
-
MMBtu
|
- | |
| 07 | 2.2511: Insulate bare equipment | $607 | $183 |
$593
6,155
kWh
|
$14
-
MMBtu
|
- | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $636 | $100 |
$636
6,448
kWh
|
- | - | |
| TOTAL RECOMMENDED | $10,371 | $37,172 |
$5,925
60,668
kWh
|
$4,472
-
MMBtu
|
$(-26.0) | ||
| TOTAL IMPLEMENTED | $10,371 | $37,172 |
$5,925
60,668
kWh
|
$4,472
-
MMBtu
|
$(-26.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs