Assessment Year | 1992 |
---|---|
Principal Product | POTATO CHIPS |
NAICS |
n/a
|
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $5 M to 10M |
# of Employees | 36 |
Plant Area |
n/a
|
Annual Production | 210,000
pieces
|
Production Hrs. Annual | 5,616
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $19,402 | 197,538 |
kWh
|
$0.098 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,371 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $2,190 | $800 |
$2,190
22,274
kWh
|
- | - | |
02 | 2.7233: Use properly designed and sized hvac equipment | $1,689 | $8,870 |
$1,689
17,292
kWh
|
- | - | |
03 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $222 | $320 |
$222
2,345
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $469 | $1,293 |
$495
4,982
kWh
|
- | $(-26.0) | |
05 | 2.4133: Use most efficient type of electric motors | $100 | $606 |
$100
1,172
kWh
|
- | - | |
06 | 2.2425: Use flue gases to heat process or service water | $4,458 | $25,000 | - |
$4,458
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $607 | $183 |
$593
6,155
kWh
|
$14
-
MMBtu
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $636 | $100 |
$636
6,448
kWh
|
- | - | |
TOTAL RECOMMENDED | $10,371 | $37,172 |
$5,925
60,668
kWh
|
$4,472
-
MMBtu
|
$(-26.0) | ||
TOTAL IMPLEMENTED | $10,371 | $37,172 |
$5,925
60,668
kWh
|
$4,472
-
MMBtu
|
$(-26.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs