ITAC Assessment: AS0057
ITAC logo
ITAC Assessment: AS0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ICE CREAM/ NOVELTY ITEMS
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area
n/a
Annual Production 5,500
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,182 6,844,959
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,357 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $41,691 $235,000 $122,422
1,759,672
kWh
$(-54,336.0)
-
MMBtu
$(-26,395.0)
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,343 - $6,343
91,149
kWh
- -
03 2.4133: Use most efficient type of electric motors $3,703 $18,211 $3,703
53,341
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,613 - $2,613
37,515
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,028 $300 $3,028
43,669
kWh
- -
06 2.4312: Improve lubrication practices $2,000 $3,276 $2,000
28,722
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,215 $3,210 $1,290
18,464
kWh
- $(-75.0)
08 2.2136: Install / repair insulation on steam lines $989 $200 - $989
-
MMBtu
-
09 3.4156: Use flow control valves on equipment to optimize water use $5,775 $6,535 - - $5,775
TOTAL RECOMMENDED $67,357 $266,732 $141,399
2,032,532
kWh
$(-53,347.0)
-
MMBtu
$(-20,695.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs