ITAC Assessment: AS0050
ITAC logo
ITAC Assessment: AS0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product READY-MIX CEMENT
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 2,200,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $558,238 6,121,337
kWh
Natural Gas $7,114 1,008
MMBtu
Fuel Oil #6 $100,393 32,545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $160,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,998

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $5,252 $38,963 $5,252
57,444
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $12,356 - $12,356
135,404
kWh
- - -
03 2.4133: Use most efficient type of electric motors $1,689 $13,875 $1,689
18,464
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,142 - $7,142
78,253
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,019 $1,000 $7,019
77,081
kWh
- - -
06 2.4312: Improve lubrication practices $3,077 - $3,077
33,705
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,360 $200 $2,360
25,791
kWh
- - -
08 2.2511: Insulate bare equipment $2,929 $1,885 - - $2,929
-
MMBtu
-
09 2.7422: Plant trees or shrubs near windows to shield from sunlight $263 $900 $263
2,931
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $514 $5,315 $628
7,034
kWh
- - $(-114.0)
11 2.7142: Utilize higher efficiency lamps and/or ballasts $2,018 $2,410 $2,160
23,740
kWh
- - $(-142.0)
12 2.7142: Utilize higher efficiency lamps and/or ballasts $5,148 $5,040 $5,148
56,565
kWh
- - -
13 2.7111: Reduce illumination to minimum necessary levels $460 $70 $460
4,982
kWh
- - -
14 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $104,246 $350,000 $199,602
2,038,980
kWh
$(-64,771.0)
-
MMBtu
- $(-30,585.0)
15 3.4115: Recover and reuse cooling water $6,188 $4,000 $1,516
16,706
kWh
- - $4,672
TOTAL RECOMMENDED $160,661 $423,658 $248,672
2,577,080
kWh
$(-64,771.0)
-
MMBtu
$2,929
-
MMBtu
$(-26,169.0)
TOTAL IMPLEMENTED $29,998 $13,035 $30,254
331,769
kWh
- - $(-256.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs