ITAC Assessment: AS0046
ITAC logo
ITAC Assessment: AS0046
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product NIGHT VISION GOGGLES
NAICS
n/a
SIC 3671: Electron Tubes
Sales Range $50
M
to 100
M
# of Employees 425
Plant Area
n/a
Annual Production 125,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $982,524 16,513,189
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,606 $37,167 $10,063
169,109
kWh
$3,543
02 2.7142: Utilize higher efficiency lamps and/or ballasts $328 $620 $328
5,569
kWh
-
03 2.3111: Heat water during off-peak periods and store for later use $41,247 $172,000 $41,247
-
kWh
-
04 2.2612: Use cooling tower water instead of refrigeration $8,576 $20,000 $8,576
288,980
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,806 $6,521 $2,806
47,186
kWh
-
06 2.4133: Use most efficient type of electric motors $1,135 $6,047 $1,135
19,050
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,014 - $1,014
16,999
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $7,367 $2,400 $7,367
123,681
kWh
-
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,242 $190 $2,242
-
kWh
-
TOTAL RECOMMENDED $78,321 $244,945 $74,778
670,574
kWh
$3,543
TOTAL IMPLEMENTED $14,564 $15,158 $14,564
206,916
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs