Assessment Year | 1992 |
---|---|
Principal Product | NIGHT VISION GOGGLES |
NAICS |
n/a
|
SIC | 3671: Electron Tubes |
Sales Range | $50 M to 100M |
# of Employees | 425 |
Plant Area |
n/a
|
Annual Production | 125,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $982,524 | 16,513,189 |
kWh
|
$0.059 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $78,321 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,564 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,606 | $37,167 |
$10,063
169,109
kWh
|
$3,543 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $328 | $620 |
$328
5,569
kWh
|
- | |
03 | 2.3111: Heat water during off-peak periods and store for later use | $41,247 | $172,000 |
$41,247
-
kWh
|
- | |
04 | 2.2612: Use cooling tower water instead of refrigeration | $8,576 | $20,000 |
$8,576
288,980
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,806 | $6,521 |
$2,806
47,186
kWh
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $1,135 | $6,047 |
$1,135
19,050
kWh
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,014 | - |
$1,014
16,999
kWh
|
- | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $7,367 | $2,400 |
$7,367
123,681
kWh
|
- | |
09 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,242 | $190 |
$2,242
-
kWh
|
- | |
TOTAL RECOMMENDED | $78,321 | $244,945 |
$74,778
670,574
kWh
|
$3,543 | ||
TOTAL IMPLEMENTED | $14,564 | $15,158 |
$14,564
206,916
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs