ITAC Assessment: AS0032
ITAC logo
ITAC Assessment: AS0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product EXTRUDED ALUMINUM
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 13,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $756,187 12,562,134
kWh
Natural Gas $66,548 33,274
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,399 $8,199 $3,399
56,565
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,218 - $7,218
119,871
kWh
-
03 2.2511: Insulate bare equipment $8,948 $708 - $8,948
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,528 $4,148 $4,528
75,322
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,425 $100 $2,425
40,445
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $160 $53 $160
2,638
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $63 $360 $63
1,172
kWh
-
TOTAL RECOMMENDED $26,741 $13,568 $17,793
296,013
kWh
$8,948
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs