ITAC Assessment: AS0026
ITAC logo
ITAC Assessment: AS0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PLASTIC INJECTION MOLDS
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range n/a
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 5,000
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,757 1,456,331
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,341 $1,500 $1,341
18,171
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $1,948 $1,200 $1,948
26,377
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $526 $1,000 $526
7,034
kWh
-
04 2.7123: Keep lamps and reflectors clean $10,888 - $9,112
123,095
kWh
$1,776
05 2.6232: Install set-back timers $702 $525 $702
9,379
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $676 $274 $676
9,086
kWh
-
07 2.7422: Plant trees or shrubs near windows to shield from sunlight $8,006 $3,100 $8,006
108,148
kWh
-
08 2.2532: Use only amount of air necessary to prevent explosion hazard $1,198 - $1,198
16,120
kWh
-
TOTAL RECOMMENDED $25,285 $7,599 $23,509
317,410
kWh
$1,776
TOTAL IMPLEMENTED - - - -