ITAC Assessment: AS0005
ITAC logo
ITAC Assessment: AS0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MOLDED PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area
n/a
Annual Production 400,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,323 1,482,122
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,187 $250 $4,187
65,064
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,723 $310 $1,524
23,740
kWh
$199
03 2.4133: Use most efficient type of electric motors $550 $729 $550
8,499
kWh
-
TOTAL RECOMMENDED $6,460 $1,289 $6,261
97,303
kWh
$199
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs