ITAC Assessment: AS0004
ITAC logo
ITAC Assessment: AS0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product LAMINATED CIRCUIT BOARDS
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 111
Plant Area
n/a
Annual Production 38,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $467,868 8,019,051
kWh
Natural Gas $449,368 102,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,219

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $804 $1,604 $804
13,775
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $876 $300 $876
14,947
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $171 - $171
2,931
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,368 $412 $1,368
23,447
kWh
TOTAL RECOMMENDED $3,219 $2,316 $3,219
55,100
kWh
TOTAL IMPLEMENTED $3,219 $2,316 $3,219
55,100
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs