Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wire and Cable
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 400,000
ft2
Annual Production 21,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,397 10,435,815
kWh
Electricity Demand $270,791 21,191
kW-mo/yr
Natural Gas $147,757 30,449
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Primary Product Savings
01 2.3212: Optimize plant power factor $34,500 $78,525 - $9,750
-
kW-mo/yr
- $24,750 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,287 $1,089 $273
12,309
kWh
$3,014
-
kW-mo/yr
- - -
03 2.4239: Eliminate or reduce compressed air usage $10,342 $6,200 $5,358
243,552
kWh
$4,984
-
kW-mo/yr
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $13,959 $8,000 - - $13,959
-
Tgal
- -
05 4.514: Re-arrange equipment layout to reduce handling costs $4,749 - - - - - $4,749
TOTAL RECOMMENDED $66,837 $93,814 $5,631
255,861
kWh
$17,748
-
kW-mo/yr
$13,959
-
Tgal
$24,750 $4,749
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs