ITAC Assessment: AR0191
ITAC logo
ITAC Assessment: AR0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Office Furniture
NAICS
n/a
SIC 2522: Office Furniture, Except Wood
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 185,000
ft2
Annual Production 156,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $149,695 4,728,019
kWh
Electricity Demand $165,893 14,983
kW-mo/yr
Natural Gas $156,260 36,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,660 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,093

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,022 $1,877 $1,478
34,584
kWh
$544
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $1,105 $1,590 $740
11,723
kWh
$365
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $582 - $389
6,155
kWh
$193
-
kW-mo/yr
- - -
04 3.4145: Use magnetic technology to treat water $12,000 $10,374 - - $12,000
-
Tgal
- -
05 4.445: Install equipment to move product $74,880 $80,000 - - - $74,880 -
06 4.425: Eliminate/reduce redundant inspections $95,071 $13,210 - - - - $95,071
TOTAL RECOMMENDED $185,660 $107,051 $2,607
52,462
kWh
$1,102
-
kW-mo/yr
$12,000
-
Tgal
$74,880 $95,071
TOTAL IMPLEMENTED $109,093 $25,461 $1,478
34,584
kWh
$544
-
kW-mo/yr
$12,000
-
Tgal
- $95,071
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs