ITAC Assessment: AR0177
ITAC logo
ITAC Assessment: AR0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range n/a
# of Employees 65
Plant Area 114,000
ft2
Annual Production 138,000,000
units
Production Hrs. Annual 2,496
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,012 7,418,816
kWh
Electricity Demand $188,814 1,792
kW-mo/yr
Natural Gas $98,215 22,839
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $445,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,480 $1,214 $1,137
24,912
kWh
$343
-
kW-mo/yr
- - -
02 2.2136: Install / repair insulation on steam lines $5,452 $6,656 - - $5,452
-
MMBtu
- -
03 2.3192: Use fossil fuel powered generator during peak demand periods $48,768 $92,500 - $48,768
-
kW-mo/yr
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $5,480 $8,000 - - - $5,480
-
lb
-
05 4.513: Re-arrange equipment layout to reduce labor costs $384,000 $400,000 - - - - $384,000
TOTAL RECOMMENDED $445,180 $508,370 $1,137
24,912
kWh
$49,111
-
kW-mo/yr
$5,452
-
MMBtu
$5,480
-
lb
$384,000
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs