ITAC Assessment: AR0173
ITAC logo
ITAC Assessment: AR0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Shirts
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 63,000
ft2
Annual Production 2,758,800
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,775 1,752,052
kWh
Electricity Demand $20,465 5,135
kW-mo/yr
Natural Gas $2,452 418
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,076 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,113 - $1,157
21,981
kWh
$956
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,436 $60 $1,392
26,377
kWh
$1,044
-
kW-mo/yr
- -
03 3.5217: Reuse / recycle/ sell paper products $1,514 $8,000 $(-1,536.0)
(-29,015)
kWh
$(-228.0)
-
kW-mo/yr
$3,278
-
lb
-
04 3.2176: Increase use of automation $12,013 $3,109 - - - $12,013
TOTAL RECOMMENDED $18,076 $11,169 $1,013
19,343
kWh
$1,772
-
kW-mo/yr
$3,278
-
lb
$12,013
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs