ITAC Assessment: AR0168
ITAC logo
ITAC Assessment: AR0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Ceramic wall and floor tile
NAICS
n/a
SIC 3253: Ceramic Wall and Floor Tile
Sales Range $1
M
to 5
M
# of Employees 95
Plant Area 400,000
ft2
Annual Production 3,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,959 1,811,254
kWh
Electricity Demand $54,090 7,364
kW-mo/yr
Natural Gas $132,907 48,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $1,016 $608 $262
4,689
kWh
$754
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $223 - $162
2,931
kWh
$61
-
kW-mo/yr
- -
03 3.4114: Replace city water with recycled water via cooling tower $11,649 $7,750 $(-427.0)
(-7,913)
kWh
$(-296.0)
-
kW-mo/yr
$12,372
-
Tgal
-
04 4.425: Eliminate/reduce redundant inspections $21,008 $100 - - - $21,008
TOTAL RECOMMENDED $33,896 $8,458 $(-3.0)
(-293)
kWh
$519
-
kW-mo/yr
$12,372
-
Tgal
$21,008
TOTAL IMPLEMENTED $1,239 $608 $424
7,620
kWh
$815
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs