ITAC Assessment: AR0164
ITAC logo
ITAC Assessment: AR0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Roll steel
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 140,000
ft2
Annual Production 62,400
ton
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,697 1,031,946
kWh
Electricity Demand $25,174 3,039
kW-mo/yr
Natural Gas $10,825 2,110
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $200,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,704

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.6231: Utilize controls to operate equipment only when needed $1,789 $2,617 $1,193
29,308
kWh
$596
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,915 $1,521 $1,223
29,894
kWh
$692
-
kW-mo/yr
- -
03 3.1192: Reduce scrap production $21,233 $25,000 - - $21,233
-
lb
-
04 2.2511: Insulate bare equipment $176,000 $24,000 - - - $176,000
TOTAL RECOMMENDED $200,937 $53,138 $2,416
59,202
kWh
$1,288
-
kW-mo/yr
$21,233
-
lb
$176,000
TOTAL IMPLEMENTED $3,704 $4,138 $2,416
59,202
kWh
$1,288
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs