| Assessment Year | 1999 |
|---|---|
| Principal Product | Steel Tubing |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $50 M to 100M |
| # of Employees | 223 |
| Plant Area |
339,978
ft2
|
| Annual Production | 95,000
ton
|
| Production Hrs. Annual | 6,880
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $560,727 | 13,894,490 |
kWh
|
$0.040 |
| Electricity Demand | $207,752 | 30,462 |
kW-mo/yr
|
$6.82 |
| Natural Gas | $59,814 | 13,857 |
MMBtu
|
$4.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $280,451 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,841 | $1,621 |
$1,418
34,584
kWh
|
$423
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,383 | $120 |
$10,138
247,362
kWh
|
$2,245
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $226 | $2,400 |
$174
4,396
kWh
|
$52
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2515: Use optimum thickness insulation | $11,267 | $1,408 | - | - |
$11,267
-
MMBtu
|
- | - | |
| 05 | 4.122: Develop standard procedures to improve internal yields | $251,669 | $66,400 |
$7,253
131,008
kWh
|
$2,166
-
kW-mo/yr
|
- | $69,825 | $172,425 | |
| 06 | 4.621: Use fixtures to reduce machine changeout times | $3,065 | $225 | - | - | - | $3,065 | - | |
| TOTAL RECOMMENDED | $280,451 | $72,174 |
$18,983
417,350
kWh
|
$4,886
-
kW-mo/yr
|
$11,267
-
MMBtu
|
$72,890 | $172,425 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs