ITAC Assessment: AR0163
ITAC logo
ITAC Assessment: AR0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Steel Tubing
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $50
M
to 100
M
# of Employees 223
Plant Area 339,978
ft2
Annual Production 95,000
ton
Production Hrs. Annual 6,880
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $560,727 13,894,490
kWh
Electricity Demand $207,752 30,462
kW-mo/yr
Natural Gas $59,814 13,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,841 $1,621 $1,418
34,584
kWh
$423
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,383 $120 $10,138
247,362
kWh
$2,245
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $226 $2,400 $174
4,396
kWh
$52
-
kW-mo/yr
- - -
04 2.2515: Use optimum thickness insulation $11,267 $1,408 - - $11,267
-
MMBtu
- -
05 4.122: Develop standard procedures to improve internal yields $251,669 $66,400 $7,253
131,008
kWh
$2,166
-
kW-mo/yr
- $69,825 $172,425
06 4.621: Use fixtures to reduce machine changeout times $3,065 $225 - - - $3,065 -
TOTAL RECOMMENDED $280,451 $72,174 $18,983
417,350
kWh
$4,886
-
kW-mo/yr
$11,267
-
MMBtu
$72,890 $172,425
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs