ITAC Assessment: AR0155
ITAC logo
ITAC Assessment: AR0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Bakery Products
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area 7,419
ft2
Annual Production 630,000
lb
Production Hrs. Annual 8,211
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,767 299,238
kWh
Electricity Demand $2,794 968
kW-mo/yr
Natural Gas $11,987 2,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,469

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1224: Replace boiler $2,248 $8,260 - - $2,248
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $24 $25 $23
293
kWh
$1
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $43 - $41
586
kWh
$2
-
kW-mo/yr
- -
04 2.2136: Install / repair insulation on steam lines $1,154 $304 - - $1,154
-
MMBtu
-
05 4.441: Install automatic packing equipment $5,204 $5,200 $(-15.0)
(-12,309)
kWh
- - $5,219
06 4.441: Install automatic packing equipment $8,393 $10,000 - - - $8,393
TOTAL RECOMMENDED $17,066 $23,789 $49
(-11,430)
kWh
$3
-
kW-mo/yr
$3,402
-
MMBtu
$13,612
TOTAL IMPLEMENTED $3,469 $8,589 $64
879
kWh
$3
-
kW-mo/yr
$3,402
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs