Assessment Year | 1998 |
---|---|
Principal Product | Plastic Bathroom Accessories |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
81,000
ft2
|
Annual Production | 290,000
pieces
|
Production Hrs. Annual | 4,693
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,518 | 3,208,675 |
kWh
|
$0.033 |
Electricity Demand | $119,794 | 10,785 |
kW-mo/yr
|
$11.11 |
Natural Gas | $49,770 | 9,923 |
MMBtu
|
$5.02 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $317,123 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $106,877 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $99 | $207 |
$53
1,758
kWh
|
$46
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $49,699 | $135,000 |
$28,024
1,300,410
kWh
|
$28,949
-
kW-mo/yr
|
$(-7,274.0)
-
MMBtu
|
- | - | - | |
03 | 3.4115: Recover and reuse cooling water | $4,517 | $6,800 |
$(-232.0)
(-7,034)
kWh
|
$(-200.0)
-
kW-mo/yr
|
- |
$104
-
Tgal
|
- |
$4,845
-
Tgal
|
|
04 | 4.445: Install equipment to move product | $210,246 | $35,000 | - | - | - | - | $210,246 | - | |
05 | 4.514: Re-arrange equipment layout to reduce handling costs | $52,562 | - | - | - | - | - | $52,562 | - | |
TOTAL RECOMMENDED | $317,123 | $177,007 |
$27,845
1,295,134
kWh
|
$28,795
-
kW-mo/yr
|
$(-7,274.0)
-
MMBtu
|
$104
-
Tgal
|
$262,808 |
$4,845
-
Tgal
|
||
TOTAL IMPLEMENTED | $106,877 | $142,007 |
$27,845
1,295,134
kWh
|
$28,795
-
kW-mo/yr
|
$(-7,274.0)
-
MMBtu
|
$104
-
Tgal
|
$52,562 |
$4,845
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs