Assessment Year | 1997 |
---|---|
Principal Product | Fractional Horsepower A/C and D/C Motors |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 325 |
Plant Area |
90,000
ft2
|
Annual Production | 6,000,000
pieces
|
Production Hrs. Annual | 5,640
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $94,470 | 3,315,651 |
kWh
|
$0.028 |
Electricity Demand | $139,944 | 9,069 |
kW-mo/yr
|
$15.43 |
Natural Gas | $27,307 | 5,294 |
MMBtu
|
$5.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,024 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,717 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,053 | $1,212 |
$2,629
93,787
kWh
|
$3,424
-
kW-mo/yr
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,085 | $186 |
$449
16,120
kWh
|
$636
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $200 | $229 |
$88
3,517
kWh
|
$112
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $265 | - |
$122
4,396
kWh
|
$143
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,152 | $150 |
$530
19,050
kWh
|
$622
-
kW-mo/yr
|
- | - | |
06 | 2.3136: Overlap custodial services with normal day hours | $89 | - |
$89
3,224
kWh
|
- | - | - | |
07 | 3.4115: Recover and reuse cooling water | $6,309 | $8,400 |
$(-459.0)
(-8,499)
kWh
|
- |
$6,768
-
Tgal
|
- | |
08 | 3.4115: Recover and reuse cooling water | $4,837 | $31,000 |
$(-918.0)
(-16,999)
kWh
|
- |
$5,755
-
Tgal
|
- | |
09 | 4.513: Re-arrange equipment layout to reduce labor costs | $31,334 | $2,000 | - | - | - | $31,334 | |
10 | 4.513: Re-arrange equipment layout to reduce labor costs | $4,700 | $1,000 | - | - | - | $4,700 | |
TOTAL RECOMMENDED | $56,024 | $44,177 |
$2,530
114,596
kWh
|
$4,937
-
kW-mo/yr
|
$12,523
-
Tgal
|
$36,034 | ||
TOTAL IMPLEMENTED | $44,717 | $41,736 |
$(-398.0)
9,672
kWh
|
$1,258
-
kW-mo/yr
|
$12,523
-
Tgal
|
$31,334 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs