ITAC Assessment: AR0125
ITAC logo
ITAC Assessment: AR0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fractional Horsepower A/C and D/C Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 90,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 5,640
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,470 3,315,651
kWh
Electricity Demand $139,944 9,069
kW-mo/yr
Natural Gas $27,307 5,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,717

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,053 $1,212 $2,629
93,787
kWh
$3,424
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $1,085 $186 $449
16,120
kWh
$636
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $200 $229 $88
3,517
kWh
$112
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $265 - $122
4,396
kWh
$143
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,152 $150 $530
19,050
kWh
$622
-
kW-mo/yr
- -
06 2.3136: Overlap custodial services with normal day hours $89 - $89
3,224
kWh
- - -
07 3.4115: Recover and reuse cooling water $6,309 $8,400 $(-459.0)
(-8,499)
kWh
- $6,768
-
Tgal
-
08 3.4115: Recover and reuse cooling water $4,837 $31,000 $(-918.0)
(-16,999)
kWh
- $5,755
-
Tgal
-
09 4.513: Re-arrange equipment layout to reduce labor costs $31,334 $2,000 - - - $31,334
10 4.513: Re-arrange equipment layout to reduce labor costs $4,700 $1,000 - - - $4,700
TOTAL RECOMMENDED $56,024 $44,177 $2,530
114,596
kWh
$4,937
-
kW-mo/yr
$12,523
-
Tgal
$36,034
TOTAL IMPLEMENTED $44,717 $41,736 $(-398.0)
9,672
kWh
$1,258
-
kW-mo/yr
$12,523
-
Tgal
$31,334
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs