Assessment Year | 1997 |
---|---|
Principal Product | Fluid Milk |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
127,972
ft2
|
Annual Production | 172,000,000
lb
|
Production Hrs. Annual | 4,380
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $245,837 | 7,537,222 |
kWh
|
$0.033 |
Electricity Demand | $140,808 | 15,508 |
kW-mo/yr
|
$9.08 |
Natural Gas | $78,511 | 20,321 |
MMBtu
|
$3.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $119,412 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,345 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,789 | $765 |
$1,789
35,170
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $396 | $642 |
$396
7,034
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,490 | $220 |
$4,490
87,046
kWh
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,860 | $1,000 |
$3,860
293,083
kWh
|
- | - | |
05 | 2.3136: Overlap custodial services with normal day hours | $1,278 | - |
$1,278
12,309
kWh
|
- | - | |
06 | 3.4115: Recover and reuse cooling water | $5,497 | $4,200 | - |
$5,497
-
Tgal
|
- | |
07 | 3.4156: Use flow control valves on equipment to optimize water use | $584 | $100 | - |
$584
-
Tgal
|
- | |
08 | 3.4154: Eliminate leaks in water lines and valves | $1,518 | $325 | - |
$1,518
-
Tgal
|
- | |
09 | 4.512: Condense operation into one building | $100,000 | $200,000 | - | - | $100,000 | |
TOTAL RECOMMENDED | $119,412 | $207,252 |
$11,813
434,642
kWh
|
$7,599
-
Tgal
|
$100,000 | ||
TOTAL IMPLEMENTED | $16,345 | $6,487 |
$8,746
387,163
kWh
|
$7,599
-
Tgal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs