ITAC Assessment: AR0122
ITAC logo
ITAC Assessment: AR0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Fluid Milk
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 127,972
ft2
Annual Production 172,000,000
lb
Production Hrs. Annual 4,380
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,837 7,537,222
kWh
Electricity Demand $140,808 15,508
kW-mo/yr
Natural Gas $78,511 20,321
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,412 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,345

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,789 $765 $1,789
35,170
kWh
- -
02 2.4133: Use most efficient type of electric motors $396 $642 $396
7,034
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,490 $220 $4,490
87,046
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,860 $1,000 $3,860
293,083
kWh
- -
05 2.3136: Overlap custodial services with normal day hours $1,278 - $1,278
12,309
kWh
- -
06 3.4115: Recover and reuse cooling water $5,497 $4,200 - $5,497
-
Tgal
-
07 3.4156: Use flow control valves on equipment to optimize water use $584 $100 - $584
-
Tgal
-
08 3.4154: Eliminate leaks in water lines and valves $1,518 $325 - $1,518
-
Tgal
-
09 4.512: Condense operation into one building $100,000 $200,000 - - $100,000
TOTAL RECOMMENDED $119,412 $207,252 $11,813
434,642
kWh
$7,599
-
Tgal
$100,000
TOTAL IMPLEMENTED $16,345 $6,487 $8,746
387,163
kWh
$7,599
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs