ITAC Assessment: AR0089
ITAC logo
ITAC Assessment: AR0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 20
Plant Area 34,300
ft2
Annual Production 40,000
thousand feet
Production Hrs. Annual 2,607
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,532 2,169,988
kWh
Electricity Demand $118,920 7,528
kW-mo/yr
Natural Gas $280,997 136,699
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings
01 2.4133: Use most efficient type of electric motors $4,855 $7,290 $1,991
73,857
kWh
$2,864
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $509 $100 $509
72,392
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $196 $75 $32
1,172
kWh
$164
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $161 $95
3,517
kWh
$264
-
kW-mo/yr
-
05 3.7311: Maintain machines to reduce leaks $3,650 $300 - - $3,650
-
gal
TOTAL RECOMMENDED $9,569 $7,926 $2,627
150,938
kWh
$3,292
-
kW-mo/yr
$3,650
-
gal
TOTAL IMPLEMENTED $8,701 $7,665 $2,023
75,029
kWh
$3,028
-
kW-mo/yr
$3,650
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs