ITAC Assessment: AR0078
ITAC logo
ITAC Assessment: AR0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Door Components
NAICS
n/a
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 4,171
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,065 1,390,387
kWh
Electricity Demand $37,182 4,415
kW-mo/yr
Natural Gas $25,414 6,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,831 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,623

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,669 $4,669 $4,016
50,117
kWh
$653
-
kW-mo/yr
-
02 2.7111: Reduce illumination to minimum necessary levels $1,486 $980 $1,292
16,120
kWh
$194
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,723 $75 $719
21,688
kWh
$1,004
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,053 $250 $438
13,189
kWh
$615
-
kW-mo/yr
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,900 - - - $2,900
-
lb
TOTAL RECOMMENDED $11,831 $5,974 $6,465
101,114
kWh
$2,466
-
kW-mo/yr
$2,900
-
lb
TOTAL IMPLEMENTED $4,623 $75 $719
21,688
kWh
$1,004
-
kW-mo/yr
$2,900
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs