ITAC Assessment: AR0061
ITAC logo
ITAC Assessment: AR0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Reprocessing
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 25
Plant Area 27,500
ft2
Annual Production 1,340,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,119 2,363,716
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $683 $661 $683
11,430
kWh
02 2.7111: Reduce illumination to minimum necessary levels $3,246 $305 $3,246
52,755
kWh
03 2.4133: Use most efficient type of electric motors $3,490 $8,240 $3,490
58,617
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,607 $610 $4,607
77,374
kWh
05 2.3212: Optimize plant power factor $1,136 $3,200 $1,136
-
kWh
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,557 $700 $2,557
-
kWh
TOTAL RECOMMENDED $15,719 $13,716 $15,719
200,176
kWh
TOTAL IMPLEMENTED $14,583 $10,516 $14,583
200,176
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs