ITAC Assessment: AR0051
ITAC logo
ITAC Assessment: AR0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pianos
NAICS
n/a
SIC 3931: Musical Instruments
Sales Range $5
M
to 10
M
# of Employees 180
Plant Area 159,800
ft2
Annual Production 1,582
pieces
Production Hrs. Annual 2,166
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,676 929,074
kWh
Natural Gas $51,396 10,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,333 $1,744 $4,333
51,583
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,125 $200 $1,125
14,068
kWh
03 2.4133: Use most efficient type of electric motors $281 $620 $281
3,517
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $438 $390 $438
5,569
kWh
TOTAL RECOMMENDED $6,177 $2,954 $6,177
74,737
kWh
TOTAL IMPLEMENTED $6,177 $2,954 $6,177
74,737
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs