ITAC Assessment: AR0045
ITAC logo
ITAC Assessment: AR0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Engine Nacelles for Commercial Aircraft
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 172
Plant Area 135,000
ft2
Annual Production 915
pieces
Production Hrs. Annual 6,257
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,462 3,883,646
kWh
Natural Gas $42,503 7,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,792 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,479 $531 $2,479
34,877
kWh
02 2.7111: Reduce illumination to minimum necessary levels $5,375 $310 $5,375
75,909
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,249 $200 $2,249
31,653
kWh
04 2.4133: Use most efficient type of electric motors $3,176 $3,090 $3,176
44,842
kWh
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,513 - $3,513
-
kWh
TOTAL RECOMMENDED $16,792 $4,131 $16,792
187,281
kWh
TOTAL IMPLEMENTED $16,792 $4,131 $16,792
187,281