ITAC Assessment: AR0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Architectural Products
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 298,000
ft2
Annual Production 8,826,000
lb
Production Hrs. Annual 8,134
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $464,176 9,890,973
kWh
Natural Gas $228,159 65,949
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,278 $1,074 $3,278
69,754
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $9,070 $540 $9,070
193,435
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,361 $350 $4,361
92,907
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $12,100 $1,000 - $12,100
-
MMBtu
TOTAL RECOMMENDED $28,809 $2,964 $16,709
356,096
kWh
$12,100
-
MMBtu
TOTAL IMPLEMENTED $28,809 $2,964 $16,709
356,096
kWh
$12,100
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs