Assessment Year | 1994 |
---|---|
Principal Product | Processed Meat Products |
NAICS |
n/a
|
SIC | 2011: Meat Packing Plants |
Sales Range | $50 M to 100M |
# of Employees | 700 |
Plant Area |
175,000
ft2
|
Annual Production | 50,000,000
lb
|
Production Hrs. Annual | 6,257
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,042,498 | 16,647,714 |
kWh
|
$0.063 |
Natural Gas | $261,941 | 83,742 |
MMBtu
|
$3.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,310 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,591 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,550 | $1,058 |
$1,550
24,619
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $3,660 | $6,380 |
$3,660
58,324
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $735 | $100 |
$735
11,723
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,980 | $1,654 |
$6,980
111,372
kWh
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $12,331 | $1,730 |
$12,331
196,952
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $33,863 | $1,000 | - |
$33,863
-
MMBtu
|
- | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,438 | $635 |
$4,438
-
kWh
|
- | - | |
08 | 2.4134: Replace electric motor with fossil fuel engine | $48,719 | $52,000 |
$68,797
1,098,769
kWh
|
$(-5,078.0)
-
MMBtu
|
$(-15,000.0) | |
09 | 2.2511: Insulate bare equipment | $2,034 | $213 |
$2,034
32,532
kWh
|
- | - | |
TOTAL RECOMMENDED | $114,310 | $64,770 |
$100,525
1,534,291
kWh
|
$28,785
-
MMBtu
|
$(-15,000.0) | ||
TOTAL IMPLEMENTED | $65,591 | $12,770 |
$31,728
435,522
kWh
|
$33,863
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs