ITAC Assessment: AR0032
ITAC logo
ITAC Assessment: AR0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Processed Meat Products
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $50
M
to 100
M
# of Employees 700
Plant Area 175,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 6,257
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,042,498 16,647,714
kWh
Natural Gas $261,941 83,742
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,591

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,550 $1,058 $1,550
24,619
kWh
- -
02 2.4133: Use most efficient type of electric motors $3,660 $6,380 $3,660
58,324
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $735 $100 $735
11,723
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,980 $1,654 $6,980
111,372
kWh
- -
05 2.7111: Reduce illumination to minimum necessary levels $12,331 $1,730 $12,331
196,952
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $33,863 $1,000 - $33,863
-
MMBtu
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,438 $635 $4,438
-
kWh
- -
08 2.4134: Replace electric motor with fossil fuel engine $48,719 $52,000 $68,797
1,098,769
kWh
$(-5,078.0)
-
MMBtu
$(-15,000.0)
09 2.2511: Insulate bare equipment $2,034 $213 $2,034
32,532
kWh
- -
TOTAL RECOMMENDED $114,310 $64,770 $100,525
1,534,291
kWh
$28,785
-
MMBtu
$(-15,000.0)
TOTAL IMPLEMENTED $65,591 $12,770 $31,728
435,522
kWh
$33,863
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs