ITAC Assessment: AR0029
ITAC logo
ITAC Assessment: AR0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Commerical Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 236
Plant Area 200,000
ft2
Annual Production 100,000,000
thousand feet
Production Hrs. Annual 4,171
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $712,082 9,394,197
kWh
Natural Gas $588,398 263,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,236

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.4133: Use most efficient type of electric motors $6,142 $8,050 $6,142
80,891
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,927 $1,991 $7,927
104,631
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,836 $327 $1,836
24,326
kWh
- -
04 2.7111: Reduce illumination to minimum necessary levels $2,232 $1,100 $2,232
29,308
kWh
- -
05 2.4134: Replace electric motor with fossil fuel engine $87,625 $54,000 $122,352
1,613,716
kWh
$(-18,727.0)
-
MMBtu
$(-16,000.0)
06 2.2136: Install / repair insulation on steam lines $3,099 $459 - $3,099
-
MMBtu
-
TOTAL RECOMMENDED $108,861 $65,927 $140,489
1,852,872
kWh
$(-15,628.0)
-
MMBtu
$(-16,000.0)
TOTAL IMPLEMENTED $21,236 $11,927 $18,137
239,156
kWh
$3,099
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs