Assessment Year | 1994 |
---|---|
Principal Product | Commerical Lumber |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 236 |
Plant Area |
200,000
ft2
|
Annual Production | 100,000,000
thousand feet
|
Production Hrs. Annual | 4,171
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $712,082 | 9,394,197 |
kWh
|
$0.076 |
Natural Gas | $588,398 | 263,036 |
MMBtu
|
$2.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,236 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $6,142 | $8,050 |
$6,142
80,891
kWh
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,927 | $1,991 |
$7,927
104,631
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,836 | $327 |
$1,836
24,326
kWh
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,232 | $1,100 |
$2,232
29,308
kWh
|
- | - | |
05 | 2.4134: Replace electric motor with fossil fuel engine | $87,625 | $54,000 |
$122,352
1,613,716
kWh
|
$(-18,727.0)
-
MMBtu
|
$(-16,000.0) | |
06 | 2.2136: Install / repair insulation on steam lines | $3,099 | $459 | - |
$3,099
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $108,861 | $65,927 |
$140,489
1,852,872
kWh
|
$(-15,628.0)
-
MMBtu
|
$(-16,000.0) | ||
TOTAL IMPLEMENTED | $21,236 | $11,927 |
$18,137
239,156
kWh
|
$3,099
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs