ITAC Assessment: AR0024
ITAC logo
ITAC Assessment: AR0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Wire Cloth
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 130,000
ft2
Annual Production 12,000,000
thousand feet
Production Hrs. Annual 6,257
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,240 1,196,952
kWh
Natural Gas $12,502 2,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,275 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $9,495 $210 $9,495
128,664
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $798 $974 $798
10,844
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,118 $1,349 $4,118
55,979
kWh
04 2.4221: Install compressor air intakes in coolest locations $154 $50 $154
2,052
kWh
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,986 - $9,986
-
kWh
06 2.8114: Change rate schedules or other changes in utility service $724 - $724
-
kWh
TOTAL RECOMMENDED $25,275 $2,583 $25,275
197,539
kWh
TOTAL IMPLEMENTED $25,275 $2,583 $25,275
197,539
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs