ITAC Assessment: AR0022
ITAC logo
ITAC Assessment: AR0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Crude Cottonseed Oil
NAICS
n/a
SIC 2074: Cottonseed Oil Mills
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 157,600
ft2
Annual Production 550,000
Tgal
Production Hrs. Annual 6,883
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $678,469 12,966,003
kWh
Natural Gas $541,533 142,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $2,415 $5,110 $2,415
54,807
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $7,133 $420 $7,133
162,075
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,129 $2,544 $4,129
93,787
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $6,867 $1,000 - $6,867
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $756 $243 $756
17,292
kWh
-
TOTAL RECOMMENDED $21,300 $9,317 $14,433
327,961
kWh
$6,867
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs