ITAC Assessment: AR0016
ITAC logo
ITAC Assessment: AR0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Automotive Service Equip.
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 215,636
ft2
Annual Production 12,204
pieces
Production Hrs. Annual 2,086
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,474 5,092,028
kWh
Natural Gas $80,350 22,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,096 $1,300 $5,096
98,769
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,200 $1,860 $2,200
42,790
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $585 $200 $585
11,430
kWh
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $2,424 $3,240 $776
14,947
kWh
$1,648
-
MMBtu
05 2.7245: Use direct air supply to exhaust hoods $7,327 $300 $7,327
142,145
kWh
-
TOTAL RECOMMENDED $17,632 $6,900 $15,984
310,081
kWh
$1,648
-
MMBtu
TOTAL IMPLEMENTED $10,305 $6,600 $8,657
167,936
kWh
$1,648
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs