ITAC Assessment: AR0015
ITAC logo
ITAC Assessment: AR0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Hydraulic Valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $50
M
to 100
M
# of Employees 470
Plant Area 232,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 6,633
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $895,310 14,826,202
kWh
Natural Gas $23,977 5,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,666 $740 $12,666
112,544
kWh
-
02 2.4133: Use most efficient type of electric motors $14,046 $6,750 $14,046
70,633
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,562 $1,000 $5,562
54,220
kWh
-
04 2.7111: Reduce illumination to minimum necessary levels $5,187 $14,712 $5,187
385,111
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,409 $5,000 $19,487
53,048
kWh
$(-1,078.0)
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,253 $12,000 $29,096
216,002
kWh
$(-3,843.0)
-
MMBtu
TOTAL RECOMMENDED $81,123 $40,202 $86,044
891,558
kWh
$(-4,921.0)
-
MMBtu
TOTAL IMPLEMENTED $5,562 $1,000 $5,562
54,220
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs