ITAC Assessment: AR0012
ITAC logo
ITAC Assessment: AR0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Swimming Pool Pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 247,552
ft2
Annual Production 133,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,976 5,723,036
kWh
Natural Gas $36,243 8,450
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,001

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $5,665 $1,170 $5,665
89,097
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,387 $400 $8,387
131,887
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $949 $720 $949
14,947
kWh
04 2.3136: Overlap custodial services with normal day hours $1,373 $100 $1,373
21,688
kWh
05 2.7233: Use properly designed and sized hvac equipment $23,430 $23,250 $23,430
368,406
kWh
06 2.2511: Insulate bare equipment $1,684 $330 $1,684
26,377
kWh
TOTAL RECOMMENDED $41,488 $25,970 $41,488
652,402
kWh
TOTAL IMPLEMENTED $15,001 $2,290 $15,001
235,931
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs