ITAC Assessment: AR0010
ITAC logo
ITAC Assessment: AR0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Dimensional Shingles
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 98,000
ft2
Annual Production 17,200
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,497 5,569,168
kWh
Natural Gas $378,673 140,204
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,767 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $1,459 $1,483 $1,459
22,860
kWh
-
02 2.2135: Repair and eliminate steam leaks $8,251 $1,400 - $8,251
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,539 $16,518 $7,539
118,406
kWh
-
04 2.2511: Insulate bare equipment $85,106 $13,998 - $85,106
-
MMBtu
05 2.4131: Size electric motors for peak operating efficiency $1,412 $30 $1,412
22,274
kWh
-
TOTAL RECOMMENDED $103,767 $33,429 $10,410
163,540
kWh
$93,357
-
MMBtu
TOTAL IMPLEMENTED $18,661 $19,431 $10,410
163,540
kWh
$8,251
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs