ITAC Assessment: AR0003
ITAC logo
ITAC Assessment: AR0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Ceramic Seal Faces
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $100
M
to 500
M
# of Employees 163
Plant Area 100,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,257
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $535,809 6,475,674
kWh
Natural Gas $145,340 40,459
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,643 $3,447 $2,643
31,946
kWh
02 2.7131: Add area lighting switches $25,255 $40,272 $25,255
305,100
kWh
03 2.4133: Use most efficient type of electric motors $2,109 $3,360 $2,109
25,498
kWh
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,806 $3,750 $9,806
-
kWh
TOTAL RECOMMENDED $39,813 $50,829 $39,813
362,544
kWh
TOTAL IMPLEMENTED $39,813 $50,829 $39,813
362,544
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs