ITAC Assessment: AM0972
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Hot Dip Galvanizing
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 62
Plant Area 86,000
ft2
Annual Production 39,303,282
lb
Production Hrs. Annual 7,224
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,150 1,504,147
kWh
Electricity Demand $46,491 4,863
kW-mo/yr
Electricity Fees $2,366 -
Natural Gas $103,445 37,252
MMBtu
Waste Disposal Costs
Water Usage $110,942 4,370
Tgal
TOTAL YEARLY COSTS $322,394
RECOMMENDED SAVINGS* $107,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,410 - $1,010
25,200
kWh
$400
-
kW-mo/yr
- - -
02 2.8121: Apply for tax-free status for energy purchases $53,500 $15,000 - - $10,700 - $42,800
03 2.7145: Install skylights $225 $4,464 $225
5,624
kWh
- - - -
04 2.4314: Use synthetic lubricant $730 $196 $524
13,106
kWh
$206
-
kW-mo/yr
- - -
05 2.7132: Install timers on light switches in little used areas $549 $439 $332
8,296
kWh
$217
-
kW-mo/yr
- - -
06 2.2515: Use optimum thickness insulation $149 $176 - - - $149
-
MMBtu
-
07 2.2515: Use optimum thickness insulation $6,329 $172 - - - $6,329
-
MMBtu
-
08 2.4239: Eliminate or reduce compressed air usage $10,700 $6,852 $10,700
331,000
kWh
- - - -
09 2.9114: Use solar heat to make electricty $33,795 $1,138,731 $33,795
894,586
kWh
- - - -
TOTAL RECOMMENDED $107,387 $1,166,031 $46,586
1,277,812
kWh
$823
-
kW-mo/yr
$10,700 $6,477
-
MMBtu
$42,800
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs