ITAC Assessment: AM0969
ITAC logo
ITAC Assessment: AM0969
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wafer Bumping and RDL
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 16,000
ft2
Annual Production 2,000
units
Production Hrs. Annual 7,068
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,436 977,000
kWh
Electricity Demand $11,374 852
kW-mo/yr
Electricity Fees $35,564 -
Natural Gas $2,550 37
MMBtu
TOTAL YEARLY COSTS $115,924
RECOMMENDED SAVINGS* $40,515 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $136 - $112
1,645
kWh
$24
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $9,093 $143
2,097
kWh
$4
-
kW-mo/yr
$269 - -
03 2.4314: Use synthetic lubricant $95 - $68
993
kWh
$27
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,342 $47 $1,653
24,307
kWh
$689
-
kW-mo/yr
- - -
05 2.7232: Replace existing hvac unit with high efficiency model $9,190 $75,000 $2,620
38,500
kWh
$570
-
kW-mo/yr
- - $6,000
06 2.8114: Change rate schedules or other changes in utility service $1,819 $7,800 - - - $1,819
-
MMBtu
-
07 2.9114: Use solar heat to make electricty $5,096 $71,900 $5,096
74,948
kWh
- - - -
08 2.8121: Apply for tax-free status for energy purchases $11,200 $15,000 - - $2,800 - $8,400
09 2.3212: Optimize plant power factor $10,221 $1,076 - $10,221
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $40,515 $179,916 $9,692
142,490
kWh
$11,535
-
kW-mo/yr
$3,069 $1,819
-
MMBtu
$14,400
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs