ITAC Assessment: AM0958
ITAC logo
ITAC Assessment: AM0958
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 40,000
ft2
Annual Production 170
Tgal
Production Hrs. Annual 2,572
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,500 706,000
kWh
Electricity Demand $21,000 2,320
kW-mo/yr
Other Gas $11,700 514
MMBtu
Waste Disposal Costs
Water Usage $10,800 1,047
Tgal
TOTAL YEARLY COSTS $77,000
RECOMMENDED SAVINGS* $23,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $211 $30 $188
4,000
kWh
$23
-
kW-mo/yr
- -
02 2.2515: Use optimum thickness insulation $380 $580 $290
6,200
kWh
$90
-
kW-mo/yr
- -
03 2.2533: Replace air curtain doors with solid doors $1,690 $3,000 $1,690
36,000
kWh
- - -
04 2.8121: Apply for tax-free status for energy purchases $11,400 $15,000 - - $2,300 $9,100
05 2.7423: Reduce heat gain by window tinting $550 $3,400 $330
6,900
kWh
$220
-
kW-mo/yr
- -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $1,515 $21,320 $1,200
25,500
kWh
$315
-
kW-mo/yr
- -
07 2.9114: Use solar heat to make electricty $7,285 $187,000 $7,285
155,000
kWh
- - -
TOTAL RECOMMENDED $23,031 $230,330 $10,983
233,600
kWh
$648
-
kW-mo/yr
$2,300 $9,100
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs