ITAC Assessment: AM0955
ITAC logo
ITAC Assessment: AM0955
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 52
Plant Area 53,087
ft2
Annual Production 150
units
Production Hrs. Annual 2,656
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,515 434,600
kWh
Electricity Demand $28,084 2,136
kW-mo/yr
Natural Gas $8,504 833
MMBtu
TOTAL YEARLY COSTS $53,103
RECOMMENDED SAVINGS* $15,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $349 $1,474 $139
3,650
kWh
$210
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $485 $1,668 $169
4,436
kWh
$316
-
kW-mo/yr
-
03 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $2,639 $69,318 $696
18,323
kWh
- $1,943
-
MMBtu
04 2.9114: Use solar heat to make electricty $12,041 $229,320 $12,041
316,881
kWh
- -
TOTAL RECOMMENDED $15,514 $301,780 $13,045
343,290
kWh
$526
-
kW-mo/yr
$1,943
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs