ITAC Assessment: AM0952
ITAC logo
ITAC Assessment: AM0952
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product students
NAICS 611110: Elementary and Secondary Schools
SIC 8211: Elementary and Secondary Schools
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area 56,139
ft2
Annual Production 150
units
Production Hrs. Annual 2,816
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $18,204 479,054
kWh
Electricity Demand $29,191 2,337
kW-mo/yr
Natural Gas $8,194 790
MMBtu
TOTAL YEARLY COSTS $55,589
RECOMMENDED SAVINGS* $10,186 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $271 $2,502 $271
7,123
kWh
- -
02 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $1,419 $35,467 $662
17,338
kWh
- $757
-
MMBtu
03 2.9114: Use solar heat to make electricty $5,741 $156,000 $5,741
151,074
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,673 $1,484 $150
3,942
kWh
$2,523
-
kW-mo/yr
-
05 2.7132: Install timers on light switches in little used areas $82 $71 $82
2,235
kWh
- -
TOTAL RECOMMENDED $10,186 $195,524 $6,906
181,712
kWh
$2,523
-
kW-mo/yr
$757
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs